RV Directory USA

First-time RV camping checklist

Your first RV trip is not the time to discover you need a sewer hose. This checklist covers the gear that matters, the arrival routine in the order that works, and the walk-around that keeps you from driving off with the steps out.

Before you leave: pick an easy first park

Book a full-hookup site at a private park or KOA within two hours of home, ideally a pull-through so you never have to back in. Stay two nights, not one, so you have a full day to learn the rig without packing up. Our guide on how to choose an RV park covers the rest, and RV parks near me will find candidates fast.

Gear checklist by category

Hookups and utilities

Leveling and setup

Tools and safety

Inside the rig

Arrival procedure, in order

  1. Check in at the office and get the site map, gate code, and quiet hours. Ask which side the pedestal is on.
  2. Walk the site before pulling in. Look for low branches, the pedestal and sewer inlet location, soft ground, and where your slides and awning will land. Decide where the rig needs to stop so the utilities reach.
  3. Position the rig with a spotter. Agree on hand signals first. Windows down, radio off. Small corrections beat one big one.
  4. Level side to side first, then front to back. Trailers: drive the low side onto blocks, chock both sides, then unhitch and raise or lower the tongue jack until level. Motorhomes: chock, then run the leveling jacks with pads under the feet. A refrigerator with an absorption cooling unit needs to be within about 3 degrees of level to work.
  5. Electric. Breaker off, plug in the EMS, plug in the cord, breaker on, check the reading. Details in our 30 vs 50 amp guide.
  6. Water. Regulator on the spigot, filter, hose, then the city water inlet. Open a faucet inside before turning the spigot fully on.
  7. Sewer. Elbow into the inlet, hose to the rig, hose on the support sloping downhill. Gray valve may open; black valve stays closed. See full hookups explained.
  8. Slides out, then awning. Check the outside for obstacles and the inside for anything on the floor before extending each slide. Retract the awning if wind picks up or you leave for the day.
  9. Turn on the water heater only after you confirm it is full of water (run the hot tap until it flows). Firing an empty electric element ruins it in seconds.
  10. Set up outside, put the mat down, and sit in the chair. You have earned it.

Daily habits at the site

Departure walk-around

Most first-trip damage happens on the way out. Print this list and physically touch each item as you go around the rig in the same direction every time.

  1. Inside: cabinets latched, fridge door locked, shower door secured, TV and loose items stowed, roof vents closed, lights off, water pump off, water heater off.
  2. Slides in, awning in and locked, antenna or satellite down, steps retracted.
  3. Sewer: valves closed, hose rinsed and stowed, cap on the outlet, elbow out of the ground inlet.
  4. Water: spigot off, hose drained and stowed, city water inlet cap on.
  5. Electric: breaker off, cord unplugged, EMS stowed, pedestal cover closed.
  6. Jacks up or blocks removed and stowed, chocks removed after the rig is hitched (trailers) or the brake is set (motorhomes).
  7. Hitch: coupler latched and pinned, safety chains crossed, breakaway cable attached, lights and brake controller tested with a helper.
  8. Tires visually inspected and pressures checked cold, lug nuts torqued on a new trailer's first few trips.
  9. Walk the site one last time for pegs, chocks, the dog's bowl, and trash.
  10. Stop at the dump station if the site had no sewer. Our dump station guide has the steps.

Once the first trip goes well, everything gets easier: try a state park campground with water and electric, then a night with no hookups. Each step teaches something the next one needs.

Frequently asked questions

What is the most forgotten item on a first RV trip?

Wheel chocks and a water pressure regulator, in that order. Dealers often send new owners home with a sewer hose and nothing else. Buy a starter kit that includes chocks, a regulator, a surge protector, and leveling blocks before the first night out.

How long does it take to set up at an RV site?

The first time, plan on 45 to 60 minutes including leveling. After a few trips most people are hooked up and sitting in a chair within 15 to 20 minutes.

Should my first trip be with full hookups or a state park?

Full hookups at a private park, close to home, for two nights. You learn the electric, water, and sewer connections with no pressure and can run to a store if something is missing. Save the scenic no-hookup site for trip two or three.

Do I need to level my RV?

Yes, for comfort and for the refrigerator. Absorption-style RV fridges stop cooling properly when more than a few degrees off level. Side-to-side leveling comes first with blocks or jacks, then front-to-back with the tongue jack or front jacks.

Related guides